Solutions & Implementations

Print
Press Enter to show all options, press Tab go to next option

City staff will be considering a wide variety of solutions ranging from education and enforcement to new access locations, traffic control strategies and geometric configurations. In addition, both short term and long range modifications will be identified, as appropriate, in order to create a Mineral Avenue corridor that addresses the issues and concerns raised by the community and captured in the project problem statement, given the resources available now and in the future.

Information will be provided as potential solutions are identified.

These solutions will then be assessed for implementation based on community preference, projected costs, funding availability, and other factors.

Residents are welcome to suggest potential solutions for city staff to consider as part of the Mineral Avenue Corridor Assessment.

The following study report was prepared for city council review.
Mineral Avenue Report


Share and Feedback

  • Use the Share & Bookmark link at the top of this page to share with neighbors and other Share & Bookmarkpotentially-interested Littleton residents. 
  • Complete the Notification and Feedback Form to receive future notifications about this study and to make suggestions and comments about the information contained on these pages.

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer